SOUTHWEST BOULEVARD COMPLETE STREETS, PROJECT NO. 2020-23, CALTRANS PROJECT NO. CRASL-5379(026)
The Southwest Boulevard Complete Streets, Project No. 2020-23, Caltrans Project No. CRASL-5379(026) is located along Southwest Boulevard approximately from Commerce Boulevard to Adrian Drive. Improvements include but are not limited to: pavement rehabilitation, additional landscape including newly constructed medians, new sidewalk, sound wall repair, and reconfiguration of travel lanes. The design engineer of the plans is BKF, Inc. See documents below for RFP, which includes Final Project Plans, Specifications, and Estimate (PS&E).
The City is requesting proposals for the following consultant services:
- Construction management
- Inspection services
The Engineer’s estimate for project construction is $3 Million, partially funded by the Regional Improvement Program, State-only funding of $2,285,000.00 administered by Caltrans Local Assistance and governed by Caltrans Local Assistance Program Guide (LAPG) and Caltrans Local Assistance Procedures Manual (LAPM) as it applies. The City would like all submitting consultants to include 185 calendar days within the proposal for Construction Management and Inspection Services.
The City’s intent is to award the construction management and inspection consultant contract prior to or concurrent with the construction contract being awarded to the construction Contractor. The bid opening for construction of the project is March 20, 2024, and is anticipated to award both the construction contract and the consultant services agreement at the April 23, 2024 council meeting.
Deadline for submittal:
Documents:
Project Contact:
Jason Sampietro
Associate Engineer
Department of Public Works
Direct (707) 588-3331
Main (707) 588-3300
Fax (707) 588-3333
Email: [email protected]